Home Start Survey Request Start Survey Estimate Create Project Template Locate Training & Resources Preliminary Site Visit Safety Plan M300 Operational Checklist Surveyor's Daily Report
Home
Download Image
Back to Map
Data Layers Turn On/Off
Eastern
North Central
South Central
Northwest
Olympic
Southwest
HQ
Horizontal Control Adjusted (h1)
Horizontal Control Other (h2)
Vertical Control Adjusted (v1)
Vertical Control Other (v2)
Combined Control (v1h1)
Combined Control (v1h2)
Combined Control (v2h1)
Combined Control (v2h2)
Not Control
Project Status:
Request Received
Office Recon
Utilities Locate
Field Recon and Preparation
Establish Control
Office Calibration
Field Calibration
Field Procedures
Office Production
COMPLETE
Hold
×
Locator

 State Route

 Mile Posts (whole number)


Locate
×
Drawing New Topography
Project Limits
  1. Zoom to desired project location, or use State Route Mile Post locator on top bar.

  2. Type in the desired name for the file in the top left corner of the map.

  3. Click the polyline draw button in top left corner of the map.

  4. Draw your TPL lines for your desired project area. Double click to end the drawing.

  5. If you need to start over, click the polyline draw button again to erase existing lines.

  6. If you are finished, click the button below, and the kml will save to your Downloads.
  7. Save and Complete

    Draw Another