WSDOT UAV M300 Operational Checklist

M300 Operational Checklist (download alternative)




Battery ID Flight Start Time Flight End Time Notes
1
2
3
4
5

Pre-Flight Operation & Inspection - Before You Go


Operations Site


Aircraft Inspection


After Mission-Equipment Breakdown & Storage


AirCraft Operation Preparation


1 2 3 4 5 *
Inspect Battery
Record Battery ID in Log, Insert Battery
Discuss Flight Plan with Participants
Power on Aircraft
Check Controller Settings (SET to "P")
Connect to Appropriate RTK Base (Verify Fix)
Make Sure SD Card has Space
Check for Sufficient GPS Signal
Final Check for Obstructions/Obstacles
Clear to Fly (Manual Flight)

Automate Flight Checks

1 2 3 4 5 *
Select Appropriate Mission
Final Check for Obstructions/Obstacles
Ensure Altitude Is Sufficient for Given Terrain
Ensure Aircraft Location is Accurate on Map
Clear To Fly

After Landing

1 2 3 4 5 *
Log Flight Times Have Been Logged
Power Off Aircraft